Downtime drives additional cost to any project. In an increasingly more competitive market, with lower margins and shorter timeframes, equipment failure could damage both reputation and earnings, and even bring the project to a halt. In the combat against climate change time is just too expensive.
In costly operations, using experienced personnel, tested methods and well-proven equipment, is the best idea.
We’ve been building subsea excavators and dredging equipment for more than two decades and have conducted numerous seabed interventions operations on behalf of the large offshore developers. Our personnel and equipment have multiple times proved their worth both in the North Sea, and in operations around the world.